{"id":5873,"date":"2025-11-03T07:05:27","date_gmt":"2025-11-03T07:05:27","guid":{"rendered":"https:\/\/i4tmaintenance.com\/au\/?p=5873"},"modified":"2025-11-27T06:41:14","modified_gmt":"2025-11-27T06:41:14","slug":"15-compliance-red-flags-when-hiring-trades-and-how-to-fix-them-fast","status":"publish","type":"post","link":"https:\/\/i4tmaintenance.com\/au\/15-compliance-red-flags-when-hiring-trades-and-how-to-fix-them-fast\/","title":{"rendered":"15 Compliance Red Flags When Hiring Trades (and How to Fix Them Fast)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"5873\" class=\"elementor elementor-5873\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-568931e e-con-full e-flex e-con e-parent\" data-id=\"568931e\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-af074cd elementor-widget elementor-widget-text-editor\" data-id=\"af074cd\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Strata managers juggle emergencies, routine jobs and recurring services on common property, often under pressure from committees and residents.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">When a burst pipe or faulty switchboard hits, speed matters. But speed without contractor compliance can backfire: unsafe work, voided insurance, cost blowouts, and reputational pain. This guide keeps things simple and practical.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">We\u2019ll walk through 15 red flags of compliance when hiring tradies, show you exactly what to look for, and give you quick fixes you can apply today. Use it to pre-qualify new vendors, tighten your onboarding, and standardise close-out.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">The aim isn\u2019t more paperwork; it\u2019s fewer surprises. With a clean, repeatable process, you\u2019ll protect residents, common property and budgets, while keeping your committee confident and informed. Let\u2019s dive in.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c7d2d1c elementor-widget elementor-widget-heading\" data-id=\"c7d2d1c\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">1. No current contractor licence on record\n\n\n\n\n\n\n\n\n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-518c155 elementor-widget elementor-widget-text-editor\" data-id=\"518c155\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">A licence proves the tradie is legally allowed to do the work. Without it, you risk defective work, fines, and denied insurance claims.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Ask for the licence number and class, plus expiry. Confirm it matches the exact scope (e.g., electrical, plumbing, gas fitting). Verify online using your state\u2019s register and save a PDF or screenshot.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">For companies, ensure the qualified supervisor\u2019s licence is linked. Re-check before every renewal or new work order. Put a \u201cno licence, no job\u201d rule in your pre-qualification pack. This is core contractor compliance and the first filter in compliance when hiring tradies.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-743deaf elementor-widget elementor-widget-heading\" data-id=\"743deaf\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">2. Missing or expired public liability insurance\n\n\n\n\n\n\n\n\n\n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9bae7db elementor-widget elementor-widget-text-editor\" data-id=\"9bae7db\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">If something goes wrong, like water damage, fire, or injury, public liability is your financial shield.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Set a minimum cover appropriate to the risk profile of your site (many schemes require $10\u201320 million). Request a current Certificate of Currency naming the contractor, policy number, limits and expiry. Cross-check the business name\/ABN. Store it against the vendor record and create auto-reminders 30 days before expiry. Refuse attendance if the policy has lapsed. Add wording in work orders: \u201cAttendance conditional on current public liability insurance.\u201d\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Solid insurance control is a cornerstone of contractor compliance and avoids costly disputes later.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b41ae5b elementor-widget elementor-widget-heading\" data-id=\"b41ae5b\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">3. No workers\u2019 compensation coverage \n\n\n\n\n\n\n\n\n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f828ffc elementor-widget elementor-widget-text-editor\" data-id=\"f828ffc\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Workers\u2019 comp protects employees and subcontractors on-site. If coverage is missing and someone is injured, your scheme and building could face claims. Ask for the workers\u2019 compensation certificate or policy schedule. Confirm it covers direct employees and check how the contractor manages subbies; are they insured, or deemed workers?\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Keep records with dates, policy numbers and insurer details. Update annually or when the contractor\u2019s workforce changes. Include a clause: \u201cAll personnel on site must be appropriately covered by workers\u2019 compensation.\u201d\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Strong controls here support compliance when hiring tradies and reduce principal contractor liability risk for strata.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7b66e12 elementor-widget elementor-widget-heading\" data-id=\"7b66e12\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">4. Vague or incomplete scope of works\n\n\n\n\n\n\n\n\n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dccaa3e elementor-widget elementor-widget-text-editor\" data-id=\"dccaa3e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">A fuzzy scope invites scope creep, delays and invoice disputes.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Issue a simple, standard scope template: objective, exact inclusions, exclusions, materials, access limits, lead times, waste disposal, site protection, and KPIs (quality, response, completion).\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Add a variations rule: \u201cNo unapproved extras.\u201d For emergencies, get a capped \u201cmake-safe\u201d scope first, then quote for permanent rectification. Attach plans, photos and asset IDs if relevant.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Clear scopes help your committee compare apples with apples and keep costs predictable. Tight scopes are practical contractor compliance, preventing arguments at invoice time and keeping everyone aligned on what \u201cdone\u201d means.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6ea8c24 elementor-widget elementor-widget-heading\" data-id=\"6ea8c24\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">5. No Safe Work Method Statement (SWMS) for high-risk work \n\n\n\n\n\n\n\n\n\n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0ef7906 elementor-widget elementor-widget-text-editor\" data-id=\"0ef7906\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">High-risk tasks\u2014work at heights, live electrical, confined spaces, asbestos, require a job-specific SWMS. A generic document won\u2019t cut it.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Ask for the SWMS before site attendance, check that it names your building, references hazards and controls, and includes PPE, rescue plans and supervision. Combine it with a brief site induction. Keep the signed version on file. If the task changes, the SWMS must be updated.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Make \u201cno SWMS, no work\u201d a standing rule. This is essential compliance when hiring tradies, demonstrating due diligence and protecting residents, visitors, and common property from avoidable incidents and regulator scrutiny.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6fd9e6 elementor-widget elementor-widget-heading\" data-id=\"b6fd9e6\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">6. Poor evidence of qualifications or trade tickets \n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb234da elementor-widget elementor-widget-image\" data-id=\"cb234da\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/image-34-1024x536.webp\" class=\"attachment-large size-large wp-image-6039\" alt=\"\" srcset=\"https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/image-34-1024x536.webp 1024w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/image-34-300x157.webp 300w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/image-34-768x402.webp 768w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/image-34.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-da95591 elementor-widget elementor-widget-text-editor\" data-id=\"da95591\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Some tasks need specific tickets: electrical licence, gas fitting endorsement, Working at Heights, EWP, confined space, backflow prevention, thermography, and more.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Create a \u201cmust-have tickets\u201d matrix per trade category and request copies upfront. Check expiry dates and verify where possible. Ensure the person attending, not just the business, holds the right credentials.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Tie tickets to the job scope so the right people arrive with the right skills. Store digitally and auto-remind for renewals. Robust ticket management strengthens contractor compliance and avoids the classic headache of an unqualified tech turning up to a high-risk task unprepared.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3af5cf elementor-widget elementor-widget-heading\" data-id=\"d3af5cf\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">7. Inadequate site induction to building rules \n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-019a161 elementor-widget elementor-widget-text-editor\" data-id=\"019a161\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Even good tradies can cause issues without a proper induction: noise complaints, wrong bin use, blocked exits, or damage to lifts and lobbies.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Provide a quick induction pack: access hours, parking, key\/fob rules, lift bookings, isolation points, amenities, asbestos register location, hot-works permit, incident reporting, and emergency contacts. Get a signed acknowledgment before work starts.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">For recurring vendors (fire, lifts, cleaners), renew induction annually or after major building changes. Good inductions are simple contractor compliance wins that cut friction with residents and keep common property presentable, safe, and compliant during and after attendance.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4bb318d elementor-widget elementor-widget-heading\" data-id=\"4bb318d\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">8. No proof of identity or onboarding details \n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1176200 elementor-widget elementor-widget-text-editor\" data-id=\"1176200\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Security matters on common property. Collect photo ID for attending personnel, plus company details: legal name, trading name, ABN\/ACN, address, bank details for payment, and after-hours contacts.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Issue unique access codes or keys logged against the person. Record when keys are taken and returned. For after-hours emergencies, set a call-out verification step to avoid scams. Keep a secure vendor profile with approvals and restrictions (e.g., \u201cno roof access without supervision\u201d). Solid onboarding supports compliance when hiring tradies, reduces theft or misuse risk, and helps you answer the inevitable \u201cWho was on site and when?\u201d<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-83199d2 elementor-widget elementor-widget-heading\" data-id=\"83199d2\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">9. Unclear defect liability and warranty terms \n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df9d4ff elementor-widget elementor-widget-text-editor\" data-id=\"df9d4ff\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">When faults appear after handover, you need a clear path to rectify. Set a defect liability period (e.g., 12 months for workmanship; per manufacturer for parts). Define response times for urgent vs non-urgent defects and require documentation when rectified.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">For assets (pumps, motors, switchboards), capture serial numbers, warranty cards and commissioning sheets. Tie the final payments to the receipt of warranty evidence.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">These clauses reduce finger-pointing and keep residents calm when issues pop up. Clear, fair warranty settings are practical contractor compliance, ensuring quality isn\u2019t just promised; it\u2019s supported for the life of the work.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51141f0 elementor-widget elementor-widget-heading\" data-id=\"51141f0\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">10. No asbestos or hazard awareness for older buildings \n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2199019 elementor-widget elementor-widget-text-editor\" data-id=\"2199019\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Many strata buildings contain legacy hazards in plant rooms, eaves, risers or services.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Provide your asbestos register and any hazardous materials plans to the contractor and require acknowledgment before attendance. If there\u2019s no register, engage a competent assessor for a survey, especially before invasive works. Mandate controls: barricades, signage, licensed removal where necessary, waste tracking. Include other hazards: lead paint, silica dust, Legionella in cooling towers.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">This step shows strong compliance when hiring tradies and protects residents, workers and the owners corporation from regulatory breaches, stop-work orders, and expensive remediation after accidental disturbance.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3fad9a elementor-widget elementor-widget-heading\" data-id=\"c3fad9a\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">11. Missing electrical compliance certificates and test records\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-41c9d81 elementor-widget elementor-widget-text-editor\" data-id=\"41c9d81\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Electrical works often require certificates and test results: switchboard upgrades, RCD installation, smoke alarms, and emergency lighting.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Specify deliverables upfront: compliance certificate, test sheets, photos, updated single-line diagrams, and asset labels. Final payment is contingent on receiving these documents. File them against the asset for future audits and insurance. For recurring services (emergency\/exit lights), require periodic test logs and rectification reports.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">This is everyday contractor compliance that prevents headaches with insurers, regulators, and committees, and provides proof that life-safety systems are working as designed, not just assumed.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1e0707 elementor-widget elementor-widget-heading\" data-id=\"a1e0707\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">12. Poor incident and near-miss reporting\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2d9536e elementor-widget elementor-widget-text-editor\" data-id=\"2d9536e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Near misses today become tomorrow\u2019s claims if ignored. Provide a one-page incident form and require notification within 24 hours for injuries, property damage, service disruptions, or complaints.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Ask for cause, corrective actions, and photos. Track corrective actions to closure and share learnings with the committee if material. For serious incidents, insist on a formal investigation summary.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">This keeps the paper trail clean and shows real compliance when hiring tradies, not just box-ticking. Over time, trends will guide smarter controls (e.g., better barricading, clearer lock-out steps) that reduce repeat events and insurance premiums.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-64d77d5 elementor-widget elementor-widget-heading\" data-id=\"64d77d5\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">13. No quality assurance or photo evidence \n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4f4456a elementor-widget elementor-widget-text-editor\" data-id=\"4f4456a\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">If you can\u2019t see it, you can\u2019t prove it. Require before\/after photos with timestamps, a simple QA checklist, and, for bigger jobs, commissioning sheets.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Ask tradies to tag assets (ID, location) in photos for easy retrieval. For cleaning or grounds, use quick geo-tagged snaps. Close-out should include a checklist signed by the attending technician. Link payment to receiving this evidence.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Visual QA supports contractor compliance, speeds committee approvals, helps with disputes, and builds a reliable maintenance history that future managers will thank you for.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aaf5fee elementor-widget elementor-widget-heading\" data-id=\"aaf5fee\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">14. Payment terms without compliance gates \n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c8ff895 elementor-widget elementor-widget-image\" data-id=\"c8ff895\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"755\" src=\"https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/ChatGPT-Image-Nov-20-2025-11_27_09-AM-2-1024x755.webp\" class=\"attachment-large size-large wp-image-6042\" alt=\"\" srcset=\"https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/ChatGPT-Image-Nov-20-2025-11_27_09-AM-2-1024x755.webp 1024w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/ChatGPT-Image-Nov-20-2025-11_27_09-AM-2-300x221.webp 300w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/ChatGPT-Image-Nov-20-2025-11_27_09-AM-2-768x566.webp 768w, https:\/\/i4tmaintenance.com\/au\/wp-content\/uploads\/2025\/11\/ChatGPT-Image-Nov-20-2025-11_27_09-AM-2.webp 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-12af3c1 elementor-widget elementor-widget-text-editor\" data-id=\"12af3c1\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Paying before you receive the required documents is asking for pain. Set staged gates: mobilisation (licences, insurances, SWMS, induction) \u2192 practical completion (photos, commissioning, test results) \u2192 final completion (certificates, warranties, as-built docs).\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">For variations, require written approval referencing the original scope. Add a defect holdback if the risk is high. Clearly state, \u201cInvoices are assessed only after all compliance deliverables are received.\u201d\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">This flips the default and makes documentation part of doing business, not an optional extra. Smart gates hard-wire compliance when hiring tradies into your AP process.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-96237ed elementor-widget elementor-widget-heading\" data-id=\"96237ed\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">15. Untracked recurring services and expiries \n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b33b381 elementor-widget elementor-widget-text-editor\" data-id=\"b33b381\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Fire, lifts, HVAC, pumps, gutters, roofs, stormwater, emergency\/exit lights; missed cycles equal non-compliance and risk.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Build a maintenance calendar with due dates, SLAs, and assigned vendors. Auto-remind 30 days before each service and escalate if not scheduled. Track certificates, logbooks and expiry dates (insurances, licences, tickets) in the same system. Use vendor scorecards to flag chronic late performers.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">A disciplined cadence is daily contractor compliance: fewer surprises, better audits, and less firefighting. Your committee will see issues earlier, and your building will thank you when the next storm rolls through.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dcaed0b elementor-widget elementor-widget-heading\" data-id=\"dcaed0b\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">How to operationalise contractor compliance workflow \n\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f86cc0b elementor-widget elementor-widget-text-editor\" data-id=\"f86cc0b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Here\u2019s a simple, step-by-step way to make contractor compliance part of your everyday strata workflow. Keep it light, keep it consistent, and you\u2019ll feel the admin pressure drop fast.<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Pre-qualification:<\/b><span style=\"font-weight: 400;\"> Grab licences, insurances, workers\u2019 comp, tickets and key policies. Verify them and file them neatly.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Job setup:<\/b><span style=\"font-weight: 400;\"> Send a clear scope, the induction pack, SWMS requirements, access details and what photos\/QA you expect.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>On-site control:<\/b><span style=\"font-weight: 400;\"> Get the contractor to check in. Confirm SWMS and PPE. Approve any variations <\/span><b>in writing<\/b><span style=\"font-weight: 400;\"> only.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Close-out:<\/b><span style=\"font-weight: 400;\"> Collect before\/after photos, test results, certificates, warranties and commissioning docs. Update the asset record.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Payment gates:<\/b><span style=\"font-weight: 400;\"> Pay only when the required compliance documents are in.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Continuous improvement:<\/b><span style=\"font-weight: 400;\"> Log incidents, review trends, use vendor scorecards, and keep registers\/calendars up to date.<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">Follow this rhythm and Compliance when hiring tradies becomes easy; less admin, fewer surprises, and a committee that feels confident you\u2019ve nailed contractor compliance.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f545f29 elementor-widget elementor-widget-heading\" data-id=\"f545f29\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Compliance is risk control, cost control and reputation control\n\n\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3909415 elementor-widget elementor-widget-text-editor\" data-id=\"3909415\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Contractor compliance isn\u2019t just more red tape.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">When you standardise the basics: licences, insurance, workers\u2019 comp, SWMS, inductions, tickets, QA and paperwork, you don\u2019t just pass audits, you stop problems before they start. The 15 red flags above are your action list: pre-qualify well, brief clearly, do a quick on-site check, then close out with evidence. Tie payments to documents, set up renewal reminders, and keep everything in one place. Result: residents stay safe, budgets stay steady, and your committee feels confident.<\/span><\/p><p><span style=\"font-weight: 400;\">Ready to make this a smooth, repeatable system?<\/span><\/p><p><b>i4T Maintenance \u2013 Maintenance Management Software<\/b><span style=\"font-weight: 400;\"> centralises contractor compliance: licences, insurances, workers\u2019 comp, SWMS, inductions, tickets, photos, certificates, warranties, asset histories and invoices, linked to jobs, vendors and assets with automated reminders and approval gates. Move faster in emergencies, stay in control day-to-day, and stop chasing last-minute certificates.<\/span><\/p><p><span style=\"font-weight: 400;\">Book a quick demo of i4T Maintenance and ensure compliance when hiring tradies effortlessly, so you can focus on people, not paperwork.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b0e7bdd elementor-widget elementor-widget-heading\" data-id=\"b0e7bdd\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQs<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24e1b1c elementor-widget elementor-widget-accordion\" data-id=\"24e1b1c\" data-element_type=\"widget\" data-widget_type=\"accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-3861\" class=\"elementor-tab-title\" data-tab=\"1\" role=\"button\" aria-controls=\"elementor-tab-content-3861\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">1. What insurance limit should I ask for?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-3861\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"1\" role=\"region\" aria-labelledby=\"elementor-tab-title-3861\"><p><span style=\"font-weight: 400;\">Match the risk. Many strata schemes use $10\u201320 million public liability. Taller buildings or a major plant may need more. Always sight the Certificate of Currency and note the expiry.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-3862\" class=\"elementor-tab-title\" data-tab=\"2\" role=\"button\" aria-controls=\"elementor-tab-content-3862\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">2. When is a SWMS required?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-3862\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"2\" role=\"region\" aria-labelledby=\"elementor-tab-title-3862\"><p><span style=\"font-weight: 400;\">Any high-risk work needs a job-specific SWMS: heights, electrical, confined spaces, asbestos, and hot works. Get it before attendance, along with a quick site induction.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-3863\" class=\"elementor-tab-title\" data-tab=\"3\" role=\"button\" aria-controls=\"elementor-tab-content-3863\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">3. How long should I keep compliance records?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-3863\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"3\" role=\"region\" aria-labelledby=\"elementor-tab-title-3863\"><p><span style=\"font-weight: 400;\">Keep records for the life of the asset + seven years, or as your insurer\/regulator advises. Store everything digitally by vendor, job and asset.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-3864\" class=\"elementor-tab-title\" data-tab=\"4\" role=\"button\" aria-controls=\"elementor-tab-content-3864\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">4. Can I approve small urgent works without documents?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-3864\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"4\" role=\"region\" aria-labelledby=\"elementor-tab-title-3864\"><p><span style=\"font-weight: 400;\">For make-safe, you can cap spend and proceed, but still require licences and insurance. Ask for the SWMS ASAP. Tight follow-up is part of solid contractor compliance.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-3865\" class=\"elementor-tab-title\" data-tab=\"5\" role=\"button\" aria-controls=\"elementor-tab-content-3865\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">5. How often should I re-check licences and insurance?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-3865\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"5\" role=\"region\" aria-labelledby=\"elementor-tab-title-3865\"><p><span style=\"font-weight: 400;\">Every renewal (or at least annually) and before new work orders. Set automated reminders. No current documents = no attendance. This keeps Compliance when hiring tradies clean and stress-free.<\/span><\/p><p><br \/><br \/><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t<script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"1. What insurance limit should I ask for?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<p><span style=\\\"font-weight: 400;\\\">Match the risk. Many strata schemes use $10\\u201320 million public liability. Taller buildings or a major plant may need more. Always sight the Certificate of Currency and note the expiry.<\\\/span><\\\/p>\"}},{\"@type\":\"Question\",\"name\":\"2. When is a SWMS required?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<p><span style=\\\"font-weight: 400;\\\">Any high-risk work needs a job-specific SWMS: heights, electrical, confined spaces, asbestos, and hot works. Get it before attendance, along with a quick site induction.<\\\/span><\\\/p>\"}},{\"@type\":\"Question\",\"name\":\"3. How long should I keep compliance records?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<p><span style=\\\"font-weight: 400;\\\">Keep records for the life of the asset + seven years, or as your insurer\\\/regulator advises. Store everything digitally by vendor, job and asset.<\\\/span><\\\/p>\"}},{\"@type\":\"Question\",\"name\":\"4. Can I approve small urgent works without documents?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<p><span style=\\\"font-weight: 400;\\\">For make-safe, you can cap spend and proceed, but still require licences and insurance. Ask for the SWMS ASAP. Tight follow-up is part of solid contractor compliance.<\\\/span><\\\/p>\"}},{\"@type\":\"Question\",\"name\":\"5. How often should I re-check licences and insurance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<p><span style=\\\"font-weight: 400;\\\">Every renewal (or at least annually) and before new work orders. Set automated reminders. No current documents = no attendance. This keeps Compliance when hiring tradies clean and stress-free.<\\\/span><\\\/p><p><br \\\/><br \\\/><\\\/p>\"}}]}<\/script>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Strata managers juggle emergencies, routine jobs and recurring services on common property, often under pressure from committees and residents.\u00a0 When [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5874,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"rank_math_title":"15 Compliance Red Flags When Hiring Trades (and How to Fix Them Fast)","rank_math_description":"Spot 15 compliance red flags when hiring trades and learn fast fixes to avoid risk, protect budgets, and ensure safe, compliant, on-time work.","rank_math_focus_keyword":"15 Compliance Red Flags When Hiring Trades","footnotes":""},"categories":[10],"tags":[],"class_list":["post-5873","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maintenance"],"_links":{"self":[{"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/posts\/5873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/comments?post=5873"}],"version-history":[{"count":34,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/posts\/5873\/revisions"}],"predecessor-version":[{"id":6045,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/posts\/5873\/revisions\/6045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/media\/5874"}],"wp:attachment":[{"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/media?parent=5873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/categories?post=5873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/i4tmaintenance.com\/au\/wp-json\/wp\/v2\/tags?post=5873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}